Applicable scope of 1.1
This process standards applicable to vertical transportation powder, and polt materials, and the promotion of the height, less than 50m material conveying capacity of less than 1600m3 / h zk middlings vertical bucket of installation.
2 construction preparation
2.1 technical preparation
Obtain complete 2.1.1 design documents and equipment technical documents
For the joint checkup of drawings so 2.1.2 and records
2.1.3 on-site inspection
2.1.4 planning construction scheme and supervising units (or other relevant departments approved by the power.)
2.1.5 related standards
2.1.5.1 "continuous conveying equipment installation project construction and acceptance GB50270 specification
2.1.5.2 mechanical equipment installation project construction and acceptance of general specification GB50231
2.1.5.3 field equipment, industrial pipe welding engineering construction and acceptance of GB50236 specification
2.1.5.4 industrial equipment, pipeline anticorrosion engineering construction and acceptance of HGJ229 specification
2.1.5.5 "chemical construction installation project hoisting construction HG20201 specification
The chemical industrial engineering construction 2.1.5.6 nineteen eighty-four HG20237 regulation technology
The vertical 2.1.5.7 bucket machine technology conditions JB3926.2 "
The vertical 2.1.5.8 bucket machine quality grading of ZQ8017 JB /